max [ L , max mean ( MGAP CPT PredErrorVars ) ]: Forecast Lead Time in Months, prediction error variance data
max [ L , max mean ( MGAP CPT PredErrorVars ) ].
Independent Variables (Grids)
- Forecast Lead Time in Months
- grid: /L (months) ordered (2.5 months) to (4.5 months) by 1.0 N= 3 pts :grid
- Start time (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered [ (0000 1 Sep 2012) (0000 1 Oct 2012) (0000 1 Nov 2012) (0000 1 Sep 2013) (0000 1 Oct 2013) (0000 1 Nov 2013)] :grid
- Longitude (longitude)
- grid: /X (degree_east) ordered (59.5W) to (52.5W) by 0.5 N= 15 pts :grid
Other Info
- datatype
- realarraytype
- fnname
- max
- gridid
- 183234832
- missing_value
- NaN
- pointwidth
- 3.0
- scale_max
- null
- scale_min
- null
- units
- months
- standard units*
- 0.0833333333333333 year
- history
- mean [ MGAP CPT PredErrorVars ] 4.5 months
- Output from CPT for 12 3-month running seasons for 1960-2009 between ECHAM4p5 GCM and CRU dataset, CPT recompiled on Mac 9.04 version
Averaged over Y[36S, 29S] minimum 0.0% data present
max mean [ MGAP CPT PredErrorVars ] - max over L[2.5 months, 4.5 months]
Last updated: Thu, 04 Feb 2016 15:18:08 GMT